Step 1
The first step in the process is to prepare the ground. To do this you should remove all debris, turf and stone, and compact the remaining earth to ensure a level finish. Depending on your project, you may need a layer of compacted hardcore to support the structure. Usually a Type 1 MOT hardcore is suitable for domestic builds, such as shed bases or driveways.
You may want to lay a waterproof membrane if you’re concerned about damp rising into the structure.
Step 2
The next step is to build your formwork. This is the frame that will create the shape of the finished slab and keep it in place until the concrete has cured. The form or frame is usually made from timber and needs to be strong and level. The timber you build with needs to be as deep as you want the slab to be, and thick enough to remain sturdy and straight when the wet concrete pushes against it. Consider laying steel mesh inside the form if you think your structure will need reinforcement.
If you are building next to an existing structure you will want to ensure the edges are straight and square. You can do this using a laser or string line and ensuring your formwork lines up with it. Once placed, build up any gaps between the ground and the frame with hardcore or soil and compact it, again ensuring it remains level. Also pack up the outside of the frame with soil to provide extra support.
Step 3
Placing your order can be tricky if you’re not sure what type or quantity of concrete you require. You can use our concrete calculator to calculate your quantity and call our team on 08005200555 to discuss the most suiltable mix for your project.
Step 4
Once your order is placed, prepare your site for the delivery.
If you plan on using wheelbarrows to get the concrete from the mixer vehicle to the required location, make sure you have a few labourers on hand to help, and enough wheelbarrows to speed up the job – we also carry two industrial wheelbarrows that you are free to use if required.
If you’ve hired a concrete pump to speed up the job, you will need to make sure the mixer vehicle and the pump have enough space to park. The mixer vehicle alone is around 11 metres long, and with the pump as well the space required goes up to about 20 metres, which is about 4 car lengths.
If you have a ground line pump, you will need to clear a path for the operator to lay it, and you may want to protect any areas that could be damaged by the pipes with visqueen.
Order Concrete Today!
- Affordable Concrete Delivery
- Mixed On Site
- Use Our Concrete Calculator
- High Quality Materials
- Zero Waste
- Expert Advice
Call to guarantee your delivery slot with a £100 deposit. Use our online calculator for a no charge, no obligation quote.